Tasks

 

In this project a new modern plant for production of Biomal with a capacity of 60 000 tonnes per year will be built and the combustion of Biomal fuel demonstrated.

 

The project will be divided into eight tasks and performed according to the figure below.

 

Task 1 Project Management and Reporting to the EC

Task 2 Feasibility study of a grinding plant

Task 3 Conceptual Design and Documentation

Task 4 Detailed Engineering, Construction Work and Start-Up

Task 5 Verification of operation data including emissions to air and water

Task 6 Co-combustion of Biomal with different base fuels

Task 7 Verfication of reduction of NOx emissions to air

Task 8 Dissemination of results